First Choice for North Beach Homeowners
PO Box 98, 8845 Caratoke Highway
Harbinger, NC 27941
NC Unlimited Residential License #13735
252-491-2670
|
|
|
See a transformation of the homeowners
ideas to reality.
Watch as the new plans take shape. |
 |
 |
|
|
|
|
As-Built
Survey |
|
|
Existing
Building Plans |
|
|
Community
Architectural Policies |
|
|
Locate
Septic and Drain Field |
 |
Current
Survey |
|
|
|
Meet
with EnVision Manager |
|
|
Outline
Ideas and Scope of Work |
|
|
EnVision
Design Team generates Plans |
|
|
Cost
Estimate into Contract |
|
|
Generate
Permits and Approvals |
|
|
|
Cama
Permit |
|
|
Repair
Area for Septic System |
|
|
Plans
Approved |
|
|
Health
Dept Permit |
|
|
Submit
Building Permit |
|
|
|
|
|

Remove old stairs, decking and shrubbery,
Pilings in ground 16' |

Construction for new decks and addition.
Sub flooring -50 yr. guarantee |

2 x 12' girders for decking,
Weather Guard applied |

Roof joists for addition &
Additional building support |
Temporary stairwell to new addition with
lighting, Roofing complete |

Side deck with Trex,
Temporary railing and stairwell
|
Flashing and weather stripping to keep
moisture out, Windows installed |

Plumbing in bath addition,
Wiring and Electrical Installed |
Rear
View of house with finished lower deck
and railing |

Back decks and railing complete |

Hurricane clips under each rafter and
Straps over hip |

Weather stripping and flashing at front
door |

New door installed |

Dry wall for the new addition ceilings |

New siding installed all sides with
architectural
details |
Insulation
applied to underdeck |
|

Vinyl siding with select detailing on
entry way |

Interior Paneling |
New front stairs for front entrance |

Siding is completed |

Outside stairwell detailing |

Entry way ceiling with skylight
with
textured finish
|

Trim work on doors and windows |

Playroom additon: Interior paneling installed,
new windows, finished ceiling |
Trim work continues in hall and new additions,
stained to match paneling |
Finished front steps and railing, Lattice
screen construction |
Enclosure of exposed insulation,
Lighting to be installed |
Exterior
finished
|